McDonald & Ross was contracted by FortisBC for the Fortis Tilbury LNG 2014/2016 Expansion Project at 7651 Hopcott Road, in Delta, BC (October/November 2015).
The project included the:
•	excavation of existing native fill materials
•	placement over embedment sand and geotextile in the driveway #1 bell hole location on Hopcott Road.  
•	The embedment sand and geotextile were to remain intact over the existing 6” and 12” gasoline.  
•	McDonald & Ross supplied and placed lightweight backfill and geotextile in driveway #1 through #4 bell hole locations on Hopcott Road.
•	McDonald & Ross worked in accordance with Golder Associates report dated July 16, 2015
•	Site restoration and general clean up