McDonald & Ross was contracted by BC Hydro for the removal of the old bridge at the Buntzen Lake Pumphouse service road in Port Moody and for the installation of a new bridge.  
 The project required environmental protection measures such as:
•	Installation of silt fencing
•	brushing out workspace on either side of proposed bridge
•	removal of  old bridge structure and disposal of materials off site
•	excavation to remove old lock blocks
•	dewatering measures to control water level in creek (usage of pumps and generators),
•	preparation of  base for new headwalls using clear crush gravel and compactors
•	setting of  base slab and building new lock block headwalls
•	installation of  new bridge deck and anchor in place
•	finishing wing walls with old lock blocks
•	backfilling and compacting approaches
•	completing bridge decking, rails and fencing
•	re-grading of access road
•	work site clean-up.